All 25 Victims of Sikkim Tunnel Collapse Recovered After 96-Hour Search

ALN NEWS DESK
ALN NEWS DESK
Updated : Jul 24, 2026, 11:09 AM IST
6 min read
  • linkedin
  • twitter
  • facebook
  • instagram
  • whatsapp

Rescue teams have successfully recovered the bodies of all 25 individuals who perished in the recent tunnel collapse in Sikkim, concluding a four-day operation.

Namchi: Rescuers have confirmed that the bodies of all 25 persons killed in Monday’s devastating tunnel collapse in Sikkim’s Namchi have been recovered. This tragic incident has not only resulted in a significant loss of life but has also raised serious concerns about safety protocols in construction projects across the region.

The collapse occurred in a section of the Adit-3 tunnel, which is part of the larger 15-kilometer-long tunnel associated with the National Hydroelectric Power Corporation (NHPC) Ltd’s Teesta Stage VI Hydropower Project. This project is crucial for harnessing the hydropower potential of the Teesta River, which flows through Sikkim and is a vital source of energy for the region. The tunnel connects the barrage at Sirwani with the powerhouse at Tarkhola in South Sikkim, and the incident took place around 1 pm on Monday, marking a catastrophic event in the ongoing construction efforts.

Among those killed in the accident was Anish Mohan, a 43-year-old geologist and manager at NHPC. Mohan was part of a specialized team tasked with assessing rock hardness and water content in crevices within the tunnel when the collapse occurred. His expertise was integral to the project, and his untimely death has sent shockwaves through the engineering and construction community. Following the recovery of his body, it has been reported that he will be sent back to his home state of Kerala for last rites.

The recovery of all 25 bodies marks the end of a grueling 96-hour search and rescue operation that involved extensive efforts from multiple agencies. The operation was characterized by a coordinated response from various rescue teams, including the National Disaster Response Force (NDRF), State Disaster Response Force (SDRF), and the Sikkim State Disaster Management Authority (SSDMA). Additionally, specialized rescue teams from West Bengal’s coal mining belt were also deployed to assist in the recovery efforts.

As of Wednesday night, 22 bodies had been recovered, with the final three being retrieved during Thursday’s operations. The Sikkim government confirmed that rescue teams conducted a thorough inspection of the tunnel after the last bodies were recovered, ensuring that no additional workers remained trapped inside. This step was critical not only for the families of the victims but also for the integrity of the ongoing construction work.

In the aftermath of the collapse, officials stated that the bodies were sent to hospitals in Singtam, Gangtok, and Namchi for medico-legal procedures. This process is essential in such cases to determine the cause of death and to ensure that all legal protocols are followed. The recovery operation, while successful in retrieving the bodies, has also highlighted the urgent need for a comprehensive review of safety measures in construction projects, particularly those involving hazardous materials like methane gas.

Preliminary investigations suggest that a suspected methane gas explosion may have triggered the tunnel collapse. Methane, a colorless and odorless gas, is often found in underground environments, particularly in areas associated with mining and tunneling. Its presence poses significant risks, as it can lead to explosions if ignited. The exact circumstances surrounding the explosion and subsequent collapse are still under investigation, and a high-level committee has been established by the Sikkim government to probe the incident thoroughly.

The implications of this tragic event extend beyond the immediate loss of life. It raises critical questions about the safety standards and regulatory oversight in the construction and mining sectors in India, particularly in mountainous regions like Sikkim, which are prone to geological challenges. The NHPC project is part of India’s broader strategy to enhance its renewable energy capacity, and while such projects are essential for sustainable development, they must be conducted with rigorous safety measures in place to protect workers.

Furthermore, the incident has garnered attention from various stakeholders, including labor unions and safety advocates, who are calling for stricter regulations and better training for workers in hazardous environments. The construction industry has faced scrutiny in the past for insufficient safety protocols, and incidents like this one reinforce the need for systemic changes to prevent future tragedies.

The families of the victims are now left to grapple with their loss, and the emotional toll of such tragedies can be profound. Support from local communities and government agencies will be crucial in the coming weeks and months as these families navigate the aftermath of this devastating event. Psychological support and financial assistance may also be necessary to help them cope with the sudden loss of their loved ones.

As the investigation into the tunnel collapse continues, it is hoped that lessons will be learned to improve safety standards in the construction industry, ensuring that such a tragedy does not occur again. The commitment to safety must be a priority for all stakeholders involved in infrastructure development, particularly in regions where the risks are heightened. The recovery of the victims' bodies, while a necessary step towards closure for their families, serves as a stark reminder of the inherent dangers associated with construction work and the ongoing need for vigilance in ensuring worker safety.

In recent years, the Indian government has made strides in promoting renewable energy sources, with hydropower projects being a significant component of this initiative. The Teesta Stage VI project is considered vital for increasing the region's energy output and reducing reliance on fossil fuels. However, the tragic collapse raises concerns about whether the push for rapid development is compromising safety standards. The balance between economic growth and worker safety is a delicate one, and incidents like this highlight the need for ongoing dialogue and reform.

Additionally, the geographical and geological conditions of Sikkim complicate construction efforts. The region is characterized by its mountainous terrain, which presents unique challenges for construction, including unstable soil and rock formations. These factors necessitate advanced engineering solutions and strict adherence to safety protocols. As the investigation unfolds, there is a pressing need to address these challenges through innovation and investment in safety technologies.

Moreover, the incident is likely to spark discussions at both state and national levels regarding labor laws and safety regulations. Advocates for workers' rights have long argued for improved conditions and protections for laborers, especially in high-risk industries. The Sikkim tunnel collapse could serve as a catalyst for legislative changes aimed at enhancing worker safety across the construction sector in India.

In conclusion, while the recovery of the victims' bodies brings a measure of closure to grieving families, it also opens the door to critical discussions about the future of construction safety in India. The tragic loss of life in the Sikkim tunnel collapse must not be in vain; instead, it should serve as a wake-up call for all stakeholders involved in infrastructure development to prioritize the safety and well-being of workers. As the nation continues to advance its renewable energy initiatives, it is imperative that safety remains at the forefront of these efforts to prevent such devastating incidents in the future.

Get More Updates

To learn more about the latest developments in Crime & Law, stay updated with our exclusive reports and analyses on AiLensNews.

Related News